Balboa - BP5 5.5 KW Control Box Bundle With TP200 Topside Control - 50-BP5-200-55-K
This Item hasFREE SHIPPING
This is a programmable system that can be configured several different ways.
NOTE- All circuits ship at 220 volts, please refer to instructions to convert a circuit to 120 volts.
In Setups 1-15, Pump 1, Circ Pump and Ozone must be the same voltage. In Setups 16-20, Pump 2 (when used), Circ Pump and Ozone must be the same voltage.
If a 24 hour circulation pump is being installed, it must have no less than a 23 GPM flow. Laing, Grundfos or Waterway Tiny Might pumps do not perform at this rate and cannot be used.